Inspections and safety · Free Word template

Mixed Robot and People Traffic Safety Plan

A Word plan for warehouses where AMRs or AGVs work alongside people and forklifts: shared, restricted and confined zones, crossings, a review of 12 common hazards, rules for people, checks each shift, emergencies, training and the changes that need a new check.

Free: enter your name, email and job title and we email you the file. It opens in Word, Google Docs and LibreOffice.
  • 12 sections on 5 A4 pages
  • 12 common hazards to review
  • Checks each shift and after changes
safee-robot-traffic-safety-plan-en.docx
ZoneLocationTypeSpeed limit (m/s)Access control
Z-01Picking aislesSharedFrom vendor settingsFloor marking and signs
Z-02Rack storage gridConfinedFrom vendor settingsFence, interlocked gate
Z-03Charging areaRestrictedFrom vendor settingsTrained staff only
Z-04Forklift crossingSharedSlow zoneSignal and stop line
Examples for a warehouse with rack robots. Speed limits come from the vendor settings and the integrator's risk assessment.
What's in the file

One plan for everyone who works near robots

It starts with the fleet and the roles, moves through zones, crossings and the risk assessment, and ends with rules, checks, emergencies, training and approval.

  1. 01

    Site, fleet and roles

    Robot types, counts, speed settings and declared standards, and who does what.

  2. 02

    Zones and crossings

    A register of shared, restricted and confined zones with speed limits and access control, and seven interfaces from walkways to the loading dock.

  3. 03

    Risk assessment

    A 5×5 matrix, action bands and 12 common hazards with their controls to rate with your team.

  4. 04

    Rules and checks

    Eight rules for people, and eight checks with frequency, person and record.

  5. 05

    Emergencies and training

    Six emergencies with the immediate action, and a training register with refresher dates.

  6. 06

    Changes and approval

    The changes that need a new check, incident recording, signatures and references.

What is a robot and people traffic safety plan?

When autonomous mobile robots (AMRs) or automated guided vehicles (AGVs) share a warehouse with pickers, forklifts and visitors, you need a written plan: where people walk and where robots run, who may enter each zone, how crossings work, what is checked each shift, and what everyone does in an emergency.

This Word plan puts that in 12 sections. It builds on the integrator's risk assessment and the manufacturer's information for use, and does not replace them.

Which standards cover warehouse robot safety?

  • ISO 3691-4:2023 (edition 2, June 2023): safety requirements and verification for driverless industrial trucks and their systems, including AGVs and AMRs, with Annex A on preparing the operating zone.
  • ANSI/A3 R15.08: Part 1 defines industrial mobile robots; Part 2 (2023) is for system integrators, with a risk assessment to ANSI/ISO 12100 or ANSI B11.0.
  • Zone types: in TÜV Rheinland's summary of the 2020 edition, the standard added the confined zone to the restricted and hazard zones, limits speed to 0.3 m/s where personnel detection is muted, and does not cover hazards from extreme climates.
  • Employer duty: Article 122 of the Saudi Labor Law requires every employer to take the precautions needed to protect workers from work hazards and illnesses.

How to prepare the plan

  1. Collect the vendor documents: information for use, risk assessment, speed settings and safety functions.
  2. Draw the zones: shared, restricted and confined on the layout, with walkways and crossings.
  3. Assess the risks with your team: twelve common hazards are ready to review; add your own.
  4. Brief everyone on the rules: staff, visitors and contractors, and record the training.
  5. Run the checks and review after every change: new routes, speeds, software or racking.

How does the plan rate risk?

Risk = likelihood (1 to 5) × severity (1 to 5) 1–4 Low · 5–9 Medium · 10–19 High · 20–25 Extreme

The bands are an example: use your company's risk procedure if it has one. The plan leaves the ratings blank on purpose; your team sets them for your site.

Sources

  • ISO, ISO 3691-4:2023 standard page (edition 2, June 2023). Source: ISO.
  • The Robot Report, 26 October 2023: release of ANSI/A3 R15.08-2. Source: The Robot Report.
  • TÜV Rheinland, white paper on ISO 3691-4 for automated guided vehicles. Source: TÜV Rheinland.
  • Fabrico, ISO 3691-4, 9 July 2026 (pre-use checks each shift, re-verification after changes). Source: Fabrico.
  • Saudi Ministry of Human Resources and Social Development: Labor Law, Article 122. Source: HRSD. Last reviewed 21 October 2026.

Example: a warehouse with rack robots and forklifts

  • The rack storage grid is confined, with a fence and an interlocked gate; a technician enters only after the robots in that zone are stopped and with a permit.
  • Picking stations are shared: the picker stands in the marked place, and a robot stops when it detects a person in its path.
  • Where robot routes cross forklift routes: a stop line, a signal and a written right-of-way rule in section 4.
  • The charging area is restricted: trained staff only, clear space, and extinguishers as the battery maker specifies.
  • Before summer, the team measures the temperature inside the building and compares it with the robot and battery ratings.

Common mistakes

  • Relying on the robot's sensors alone. Marking, walkways and training are part of safety.
  • Forgetting visitors and contractors. They know least about how robots behave.
  • Pushing a stopped robot by hand. Only a trained person moves it, as the manual allows.
  • Changing routes without a re-check. Every change needs the risk assessment updated.
  • Blocked fire exits. Set no-go areas in the fleet map and link them to the fire alarm.

What the template does not cover

The plan does not replace the integrator's risk assessment, the manufacturer's information for use, or your country's safety rules. Standards change, so check their current editions. To record stops and incidents, use the Robot Fleet Uptime and Incident Log.

Related Safee solution

Outside the building: vehicle speed in yards and docks

Safee does not manage robots. It tracks the trucks and vehicles fitted with a tracking unit in the warehouse yard and docks, and alerts you when one speeds inside a geofence you draw around the yard.

  • Speed Inside a Geofence alarm, with the speed limit you set for the yard or site.
  • Geofences around the yard and docks, with entry and exit times.
  • Speed reports by vehicle and driver.
  • Trip and stop reports for the trucks that serve the warehouse.
FAQ

Questions about warehouse robot safety

Want to control truck speed in your warehouse yard? Talk to Safee.

Which standard covers mobile robot safety in a warehouse?

ISO 3691-4:2023 for driverless industrial trucks and their systems, including AGVs and AMRs. In North America, ANSI/A3 R15.08 for industrial mobile robots. Ask the vendor for the certificates and the risk assessment.

What is the difference between shared, restricted and confined zones?

In a shared zone people and robots work together with personnel detection active. A restricted zone is for trained, authorized people only. A confined zone keeps people out with barriers, so nobody enters before the robots are stopped.

Who does the risk assessment?

The integrator assesses the application on your layout and the manufacturer provides the information for use. The risk assessment in this plan adds the risks of your daily operation.

Does summer heat affect robot safety?

TÜV Rheinland's summary notes that the standard does not cover hazards from extreme climates. Measure the temperature inside the building in summer and compare it with the robot and battery ratings.

How often should emergency stops be checked?

As the manufacturer's manual sets. The plan includes a check each shift for buttons, lights, floor and exits, and a new check after every change.

Can I use the template for autonomous forklifts?

Yes. Autonomous forklifts and pallet movers are driverless industrial trucks: list them in section 1 and add the lifting and pallet hazards.

Next step

Talk to Safee about your warehouse fleet

Tell us about the trucks and vehicles that move in your warehouse yard, and we will show you how Safee alerts you to speeding inside the yard.

Related tools and templates

More for warehouse safety

Get the report

Enter your details and we will email you the file.

Use your real name so the file arrives addressed to you. Don't worry, we won't flood you with emails or calls.

Scroll to Top