Inspections and safety · Free Excel and Word template

Lifting Equipment Inspection and Certification Register

One register for your cranes, forklifts and man-lifts, the slings and shackles that go with them, and the cards of the people who operate and rig them. It works out when each third-party examination falls due, flags what has expired or is due soon, and keeps the defects in the same file. A Word lift plan and pre-lift checklist comes with it.

Free: enter your name, email and job title and we email you the file. The register works in Excel, Google Sheets and LibreOffice Calc with no macros; the lift plan opens in Word, Google Docs and LibreOffice.
  • Equipment, accessories and cards
  • Expired and due-soon flags
  • Lift plan on 3 A4 pages
safee-lifting-equipment-inspection-register-en.xlsx
IDTypeLast examinationIntervalNext dueOpen defectsStatus
CR-01Mobile crane2025-11-20122026-11-201Out of service
CR-02Crawler crane2025-09-14122026-09-140Expired
FL-07Forklift2026-03-02122027-03-020Valid
ML-03Man-lift or MEWP2026-05-1862026-11-180Due soon
TC-01Tower crane2026-08-05122027-08-050Valid
Example rows on 21 October 2026, with the example intervals on the Settings sheet and a 30-day warning.
What's in the files

Certificates, cards and defects in one place, and a lift plan for the day of the lift

The HSE or plant team keeps the register up to date from the third-party certificates and the pre-use checks. The lift supervisor uses the Word lift plan for each planned lift and checks the certificates against the register.

  1. 01

    Equipment

    Cranes, forklifts, telehandlers, man-lifts and hoists with type, serial, safe working load, owned or hired, site, last thorough examination, inspection body and certificate. It works out the next examination, the days left and the status.

  2. 02

    Accessories

    Slings, chains, shackles, hooks, eyebolts, beams and chain blocks by tag number, with their own intervals and a column for items removed from use.

  3. 03

    Operators and riggers

    Cards of crane, forklift and MEWP operators, riggers, signallers and lift supervisors, with the issuer, expiry date, days left and status.

  4. 04

    Defects

    Defects found in pre-use checks and examinations, with severity and closing date. An open "out of service" defect marks the machine Out of service on the Equipment sheet.

  5. 05

    Summary and settings

    Counts by status and by site. Intervals by equipment and accessory type, the warning window, site codes, and a summary of the rules in Dubai, Sharjah, Bahrain and Saudi Arabia with sources.

  6. 06

    Word: lift plan

    Lift details, equipment and certificates, load, radius and capacity used, site conditions, people and cards, sequence, a pre-lift checklist and sign-offs.

What is a lifting equipment inspection register?

A lifting equipment register lists every crane, forklift, man-lift and lifting accessory on your sites with its last thorough examination by a competent third party, the certificate number and when the next examination is due. A good register also covers the people: the operator, rigger and signaller cards that clients and authorities ask to see.

The aim is simple: no machine or sling is used after its certificate expires, and nobody operates or rigs without a valid card. In practice the dates sit on paper certificates in different site offices, and an expired one is found by an inspector or after an incident. One register with calculated due dates puts them in front of you weeks before.

What do Gulf authorities require?

Rules differ by country and emirate, and clients often add their own. A short summary, checked on 21 October 2026:

  • Dubai: cranes, lifts, lifting equipment and gear, and forklifts are inspected and certified every 12 months by a third party accredited by EIAC, and the certificate is kept on site. Crane, man-lift and forklift operators, riggers and signallers must be approved by an EIAC-accredited third party (Dubai Municipality, DM-HSD-GU48-ECLA1, version 5, 29 January 2025, §4-1).
  • Sharjah: a thorough examination by a third party before first use and at least every 12 months for lifting goods, every 6 months for equipment lifting people and for lifting accessories; findings go in the lifting equipment inspection register, and operator, signaller and rigger certificates are kept (SPSA, OSHJ-CoP-10, version 2, July 2024, §5.7–5.8).
  • Bahrain: lifting equipment is inspected at least weekly while in use; cranes, pulleys and cradles get a full test every 6 months and hoists and winches every 14 months (Ministerial Decision No. 5 of 2014, Articles 5 and 17).
  • Saudi Arabia: SASO's technical regulation for lifting equipment requires a certificate of conformity for new and used cranes, forklifts and accessories placed on the market (SGS notice, 17 March 2026). Periodic inspection intervals then come from your client or project HSE plan.

The register does not choose for you: enter the interval for each type on the Settings sheet, using the strictest rule that applies to the site.

How to use the register and lift plan

  1. Set the intervals for each equipment and accessory type, the warning window (30 days in the example) and your site codes.
  2. Enter each machine and accessory from its third-party certificate: last examination date, inspection body and certificate number.
  3. Enter each card with its expiry date and issuer.
  4. Log defects from pre-use checks and examinations, and close them with a date when fixed.
  5. Review the Summary every week: stop anything Expired or with No certificate, and book examinations for anything Due soon.
  6. For each planned lift, complete the Word lift plan and check its certificates against the register.

How does the register work out the status?

Interval used = own interval for the machine, or the Settings interval for its type Next examination = EDATE(last examination, interval) Days left = next examination − as-of date Status = Out of service if marked, or an open defect is "out of service until repaired" No certificate if there is no examination date Expired if days left < 0 Due soon if days left ≤ warning window Valid otherwise

Cards use the expiry date on the card in the same way. The as-of date is today by default; type a fixed date on Settings to review a past day.

Worked example: six machines on 21 October 2026

  • CR-02, a hired crawler crane examined on 14 September 2025 with a 12-month interval, was due on 14 September 2026: 37 days ago, so Expired. It must stop until the hire company has it examined.
  • ML-03, a man-lift examined on 18 May 2026 with the 6-month interval for lifting people, is due on 18 November 2026: 28 days left, so Due soon.
  • CR-01 is within its certificate, but a load moment indicator warning logged on 18 October is still open as "out of service until repaired", so the crane shows Out of service.
  • On the Operators sheet, a forklift operator's card expired on 19 June 2026 and a lift supervisor has no card recorded: both show in red.

Common mistakes with lifting equipment records

  • Tracking cranes but not accessories. Slings and shackles have shorter intervals in many codes and wear faster.
  • Forgetting hired machines. The site that uses the crane is responsible for checking its certificate, whoever owns it.
  • One interval for everything. Equipment lifting people often has a shorter interval than equipment lifting goods.
  • Defects without a closing date. An open defect nobody closes leaves a machine in use with an unknown fault, or stopped for no reason.
  • Cards checked only at induction. Operator cards expire during long projects.

What the template does not do

The register follows the dates you enter. It does not replace the third-party examination, the certificate or the pre-use check, and it does not tell you which rule applies to your site. The rules summary is for reference and may change; check the current text with the authority before relying on it. The lift plan is a form: the load chart, the capacity limits for critical lifts and the method come from the crane manufacturer and your company or client procedure. For daily machine checks, use the Heavy Equipment Daily Inspection Checklist; for document dates beyond lifting, the Fleet Document Expiry Reminder.

Related Safee solution

Get expiry alarms, and see where each machine is and whether it works

Safee's Expiries Explorer sends expiry alarms by system message, email or mobile push to the people you choose, and the maintenance module fires a task on a date, a distance or engine running time. Live tracking and geofence reports show which site each crane or forklift is on, and Equipment Activity Status shows whether it is working.

  • Expiry alarms with their own notification receivers: system, email or mobile push.
  • Maintenance tasks fired by a date, a distance or engine running time.
  • Geofence reports showing each machine's arrival at and departure from a site.
  • Equipment Activity from a signal on the machine: active or not active.
FAQ

Questions about lifting equipment registers and lift plans

Want to know where every crane and forklift is and whether it is working? Talk to Safee.

How often do cranes need a third-party inspection in the UAE?

Dubai Municipality's guideline requires cranes, lifting equipment and forklifts to be inspected and certified every 12 months by an EIAC-accredited third party. Sharjah's code sets at least every 12 months for lifting goods and 6 months for lifting people and for accessories. Your client may ask for more.

How often should slings and shackles be examined?

Sharjah's code says lifting accessories are examined at least every 6 months and need a valid test certificate. They are also checked before each use. Enter your rule on the Settings sheet; the register works out each tag's next date.

What should a lifting equipment register include?

Each item's ID, type, serial number and safe working load, its site, the last thorough examination, the inspection body, certificate number, the next date and its status, plus defects and the cards of the people who operate and rig.

Do hired cranes need to be in the register?

Yes. The certificate goes with the machine, and the site using it needs to see it. Enter hired machines with the hire company's name and check their certificates on arrival.

What is a lift plan?

A written plan for a lift: the load and its weight, the crane and its capacity at the radius, the rigging, site conditions, people and the sequence. Sharjah's code asks for a documented lifting plan that addresses the risks found in the risk assessment.

Which lifts count as critical?

That is set by your company or client procedure, often by the share of the crane's rated capacity used, the load, or tandem lifts. The lift plan has a line for your company limit so the plan uses your rule.

Do the files work in Google Sheets and Google Docs?

Yes. Upload them to Google Drive and open them there. They also work in Excel, Word and LibreOffice, with no macros.

Next step

See every crane and forklift on your sites

Tell us how many lifting machines you run, owned and hired, and on which sites, and we will show you how Safee shows where each one is, whether it is working, and the expiry alarms you can set.

Related tools and templates

Keep heavy equipment safe and certified

Get the report

Enter your details and we will email you the file.

Use your real name so the file arrives addressed to you. Don't worry, we won't flood you with emails or calls.

Scroll to Top