Planning · Free calculator

Warehouse Robot Fleet Size & Charging Calculator

Work out how many autonomous mobile robots (AMRs) or AGVs your peak hour needs from the task rate and cycle time, then the extra robots and the chargers that charging takes, and what a given fleet can deliver per hour.

  • Runs in your browser
  • Your own site figures
  • Formulas shown below

Describe one task a robot does: move a rack, tote or pallet from one point to another, then return. The defaults are an example of a goods-to-person system; replace them with your site's figures.

Demand and task cycle
tasks / h

Racks or totes brought to stations, or parcels moved. Use the peak hour, not the daily average. Example value.

s

Pick-up, drop-off and waiting at the station. Example value.

m

From pick-up to drop-off along the real route. Example value.

m

To the next task or the parking point. Example value.

m/s

The average with turns and slowing near people, not the top speed on the datasheet. Example value.

min

If you measured it in a pilot, enter it; it replaces the station and travel calculation.

Available time
%

Share of time the robot is not broken down or in maintenance. Groover's textbook example uses 95%.

%

Time left after waiting at crossings and queues. 100% means no congestion. Groover's example uses 90%.

How this is calculated
Cycle time = station time + (loaded + empty travel) ÷ speed Workload = tasks per hour × cycle time (robot-min per hour) Available time = 60 × availability × traffic factor (min per robot-hour) Robots = round up (workload ÷ available time)

Full methodology is below.

Robots for the workBased on values entered

Compare vendor proposals

Report with the inputs, cycle time, robots, chargers and fleet capacity.

Fleet size report

Get the full report for operations and procurement

  • Task cycle time and travel share
  • Robots for the peak work
  • Extra robots and chargers for charging
  • Capacity of a given fleet, short or spare
  • Methodology, sources and next steps

How many warehouse robots do you need?

The number of autonomous mobile robots (AMRs) or automated guided vehicles (AGVs) a warehouse needs comes from two things: the work they must do in the peak hour, and the minutes each robot can really work in an hour once breakdowns, congestion and charging are taken out.

The calculator works out the task cycle time, the robots needed for your peak, the extra robots and the chargers that charging takes, and the tasks per hour a given fleet can deliver.

Why size the fleet before you sign?

  • Too few robots: stations wait for racks or totes, and the pick rate in the business case is never reached.
  • Too many robots: you pay for idle robots, and more robots on the same aisles means more congestion, which simulation studies show can cost time instead of saving it.
  • Charging is part of the fleet: a robot on a charger is not working. A PhD study on AGV fleet sizing found that battery management significantly affects throughput and vehicle use.
  • Vendor proposals differ: the same calculation for every proposal shows which assumptions about speed, travel and charging each one makes.

What inputs do you need?

InputWhere to find itTip
Tasks per hour at peakWMS order history: lines or totes per hour on your busiest daysWhite Friday, Ramadan and Eid are usually the peak in the Gulf.
Station time per taskPilot, time study, vendor simulationInclude waiting at the station, not only the hand-over.
Loaded and empty travelLayout drawing with the robot routesUse average distances over all storage locations, not the nearest ones.
Average speedPilot data or the vendorAverage with turns and slowing near people, below the top speed.
Run time and charge timeVendor datasheet at your payloadCheck the charge window (for example 20% to 80%).
Availability and traffic factorVendor service level, simulation, your historyAsk the vendor what they assumed in their own fleet calculation.

How is the fleet size calculated?

Task cycle and robots for the work

Cycle time = station time + loaded travel ÷ speed + empty travel ÷ speed Workload = tasks per hour × cycle time (robot-minutes per hour) Available time = 60 × availability × traffic factor (minutes per robot-hour) Robots = round up (workload ÷ available time)

This is the analysis of vehicle-based material transport systems in Groover's textbook (delivery cycle time, workload, available time and number of vehicles), the same logic as in Mantel and Landeweerd: the number of vehicles is the loaded and empty travel time plus waiting time over a busy period, divided by the time a vehicle is available.

Charging

Charge ratio = charge time ÷ run time per charge Charging during operation: robots = round up (exact working robots × (1 + charge ratio)) Robots on chargers at once, on average = exact working robots × charge ratio Chargers = round up (that average × (1 + spare share)) Charging between shifts (battery lasts the day, charge fits the hours left): no extra robots; chargers = round up (robots ÷ robots one charger can charge in the hours left)

The charging step is an energy balance: every hour of work needs charge time ÷ run time of an hour on a charger. Opportunity charging, a few minutes between tasks, spreads that time across the shift but does not remove it.

Sources

  • M. P. Groover, Automation, Production Systems, and Computer-Integrated Manufacturing, chapter 10 (material transport systems), section 10.6: delivery cycle time, workload, available time = 60 × availability × traffic factor × efficiency, number of vehicles (example with 95% availability and a 0.90 traffic factor), as taught in NIT Srinagar course MEC 405. Source: NIT Srinagar lecture notes.
  • R. J. Mantel and H. R. A. Landeweerd, Design and operational control of an AGV system, International Journal of Production Economics 41, 1995, pp. 257–266. Source: University of Twente.
  • C. R. Standridge, Beyond Lean: Simulation in Practice, section 17.3 (an analytic estimate that assumed no blocking gave 2 AGVs; simulation showed 3 were needed, with more congestion as vehicles were added). Source: LibreTexts.
  • OMRON, Autonomous Mobile Robot MD series datasheet I885-E, 2024 (run time 10 h with no payload and 8 h at full payload; recharge 19.6 min from 20% to 80%). OTTO Motors, How do AMRs charge?, 15 December 2025 (opportunistic charging between jobs; charging speed affects fleet size and the number of chargers). Source: OMRON, OTTO Motors.
  • A. Hamdy, Optimization of Automated Guided Vehicles (AGV) Fleet Size With Incorporation of Battery Management, PhD dissertation, Old Dominion University, 2019. Source: ODU Digital Commons. Last reviewed 21 October 2026.

Worked example: 600 rack moves an hour

The defaults are examples, not robot specifications; replace them with your own figures.

  • Each task has 30 seconds at the station and 60 m loaded plus 60 m empty at 1.2 m/s: 0.5 + 0.83 + 0.83 = 2.17 minutes, 77% of it travel.
  • 600 tasks an hour make a workload of 600 × 2.17 = 1,300 robot-minutes an hour. With 95% availability and a 0.90 traffic factor each robot gives 51.3 minutes an hour, so 1,300 ÷ 51.3 = 25.3, or 26 robots for the work.
  • With 8 hours of work per charge and 60 minutes to recharge, the charge ratio is 0.125. Running 20 hours a day leaves too little time to charge between shifts, so robots charge during operation: 25.3 × 1.125 = 28.5, or 29 robots, three more for charging.
  • On average 3.2 robots are charging at once: 4 chargers, still 4 chargers with 25% spare.
  • A proposal with 25 robots delivers about 526 tasks an hour, 12% below the peak: four robots short.
  • A single 9-hour shift with 10 hours of run time and 2 hours of charging would let the 26 robots charge after the shift, 7 robots per charger in the 15 hours left: 4 chargers and no extra robots.

How to read your results

  • Exact working robots: the fraction tells you how close the rounded fleet is to its limit; 25.3 rounded to 26 has little spare.
  • Travel share of the cycle: when travel dominates, slotting fast movers near the stations or adding stations shortens the cycle more than faster robots.
  • Charge share: the share of fleet time spent on chargers. Faster charging or a longer run time lowers the extra robots.
  • Capacity of a fleet: below 0% headroom, the fleet cannot keep up with the peak you entered.

How to need fewer robots

  • Shorten travel: put fast-moving SKUs near the stations and review the layout of routes.
  • Cut station waiting: balance the work between stations so robots do not queue.
  • Reduce congestion: one-way routes, wider crossings and separated people and robot zones raise the traffic factor.
  • Plan charging: charge in low-demand hours, and place chargers near the routes.
  • Check the money: test the fleet in the Warehouse Robot ROI Calculator.

Assumptions and limits

The calculator uses averages: every task has the same cycle, tasks arrive evenly through the hour, and the peak rate runs for all operating hours, so real queues are longer when cycles vary. Congestion is a single factor you enter; it rises as robots are added, which only a simulation or a pilot can show, and Standridge's case study shows an analytic estimate that was one vehicle short. Charging assumes the energy used is proportional to working time. Battery ageing, heat in summer and the charge window in the datasheet change run and charge times. All defaults are examples, not robot specifications. Use the result to plan and to compare vendor proposals, then confirm it with the vendor's simulation and a pilot.

Related Safee solution

Around the warehouse: the vehicles and equipment Safee tracks

Safee does not manage robots. It tracks the delivery vans and trucks that serve the warehouse, and records the active and idle time of equipment fitted with a tracking unit.

  • Delivery van and truck tracking with trips, stops and geofences around the docks.
  • Equipment Activity Status from a machine signal, engine RPM or motion and angle sensors.
  • Equipment Activity report with the active and non-active time of each machine.
  • Excel export of the trips and reports you select.
Questions

Questions about robot fleet size and charging

Want to review the vehicles that serve your warehouse? Talk to Safee.

How do you calculate the number of AGVs or AMRs needed?

Multiply the tasks per hour by the cycle time of one task to get the workload in robot-minutes per hour, and divide it by the minutes one robot can work in an hour: 60 × availability × traffic factor. Round up, then add the robots that charging takes.

How many chargers does a robot fleet need?

When robots charge during operation, the average number charging at once is the working robots × charge time ÷ run time; round up and add the spare share you choose. When the battery lasts the day, count how many robots each charger can charge in the hours between shifts.

What is opportunity charging?

Robots go to a charger for a few minutes between tasks instead of running the battery down. It spreads charging across the shift so fewer robots leave work at once, but the total charge time still has to come from the fleet.

What traffic factor should I use?

Your own, from a pilot or the vendor's simulation. A value of 100% means no waiting at crossings or queues. The textbook example in the method uses 90%; congestion grows as more robots share the same aisles.

Does the calculator work for goods-to-person, sortation and pallet robots?

Yes, for any robot that repeats a task cycle: rack or tote moves to stations, parcels to sort chutes, pallets between docks and storage. Enter the task rate and the distances of that flow.

Why does the vendor quote a different robot count?

Vendors use their own simulation with assumptions on speed, travel, station time and charging. Enter their assumptions here to see where your figures differ, and ask for the simulation report.

Does heat in Gulf warehouses affect the fleet?

Battery run time and charge time depend on temperature, and datasheets give them under set conditions. Ask the vendor for figures at the temperatures in your warehouse in summer.

Next step

Talk to Safee about your warehouse fleet

Tell us about the vehicles and equipment that run around your warehouse, and we will show you how Safee tracks their trips and activity.

Related tools and resources

Move on to your next fleet question